04 · WALL AND FLOOR TILING · MELBOURNE AND SURROUNDING SUBURBS
Tiling is at the centre of Ivan Bodnar’s work, built on around 15 years in residential renovations. We check the wall or floor, prepare it properly and mark out the layout before any adhesive goes on.
Illustrative stock photograph: tiling tools and adhesive on a hexagonal tiled surface.
SCOPE AT A GLANCE
We do wall and floor tiling in bathrooms, kitchens and splashbacks, laundries and other rooms of the home. Each job covers inspection, surface preparation and levelling, setting out, laying, grouting and clean-up.
If tiling is part of a larger renovation that needs plumbing or electrical work, appropriately licensed tradespeople carry out that work and we coordinate with them. You can read how that works on working with licensed tradespeople.
15
YEARS OF RESIDENTIAL RENOVATION EXPERIENCE
1,000+
COMPLETED RENOVATION, REPAIR AND IMPROVEMENT PROJECTS
A tiled finish can only be as flat and sound as what sits underneath it. One of the biggest lessons from years on site is that a good result depends on what happens before the final finishes are installed.
Illustrative stock photograph: straight, even grout lines depend on a flat, sound surface underneath.
CHECKED AT THE FREE SITE INSPECTION
Flatness and level. High spots, dips and floors that rock under a straightedge.
Existing tiles. Hollow-sounding, loose or cracked tiles, and whether they need to come off.
Moisture and staining. Signs of water getting where it shouldn’t, especially in wet areas.
Cracks and movement. Cracks in walls, floors or joints that suggest something underneath has shifted.
Old adhesive and coatings. Residue, paint or sealers that would stop new adhesive bonding properly.
Falls to drains. In bathrooms and laundries, whether the floor directs water towards the waste.
What we find shapes the scope, the materials and the method. For more on this stage, see surface preparation before tiling and flooring.
HOW A TILING JOB RUNS
01
We start on site, looking at the room, the existing finishes and how you use the space. You get a plain explanation of what the job needs and why.
02
Walls and floors are checked for flatness, soundness and moisture, and old tiles are tapped for hollow or loose areas. This tells us whether the surface can take tiles as it is or needs work first.
03
Loose material, old adhesive and high spots are removed, and low areas are built up until the surface is flat and true. Most people never see this stage, but the finish depends on it.
NOTE: The scope at this stage depends on the property’s condition and what the assessment finds.
04
Before anything is stuck down, a reference line is marked and the layout is planned around doorways, fixtures and the parts of the room you look at most. Cuts are balanced so you aren’t left with thin slivers along an edge you see every day.
05
Tiles are laid to the line, with spacers and levelling clips where the tile needs them, and checked as the work goes. Once the adhesive has set, the joints are grouted and the edges finished neatly.
06
The area is cleaned and the debris taken away, with care for the rest of your home. Then we walk through the finished work with you, so you can see exactly what has been done.
A tiling quote is based on what can be seen and checked at the inspection. Sometimes removing old tiles shows damage that wasn’t visible before, such as moisture, deteriorated backing or an uneven base. If that happens, or if the agreed scope changes, we stop and talk it through with you before going any further. There’s more on this in concealed damage and changes to scope.
If you’d like an honest opinion on a wall or floor, text a few clear photos or a short video to 0413 142 055, or use the enquiry form to request a free quote.