05 · FLOORING · MELBOURNE AND SURROUNDING SUBURBS
A new floor is only as flat, firm and lasting as whatever sits underneath it. Ivan Bodnar is an independent home renovation specialist with around 15 years of hands-on experience in residential renovations, including flooring, tiling and surface preparation. You deal directly with the person who lifts the old floor, checks what’s underneath and lays the new one.
WHAT THIS WORK COVERS
New flooring as part of a bathroom, kitchen, laundry or wider home improvement.
Replacement of worn, damaged or dated flooring, including removal of the old surface.
Subfloor assessment before anything new is laid.
Levelling and preparation where the assessment shows it’s needed.
BEFORE THE NEW FLOOR
One of the biggest lessons from years on residential jobs is that a good renovation depends on what happens before the final finishes are installed. Lippage, hollow spots, cracking and gaps along the walls usually trace back to a subfloor that wasn’t checked properly.
WHAT WE LOOK AT ON SITE
We check the floor with a straightedge and level to find dips, humps and falls that would show through or stress the new surface.
Movement, bounce or loose sections underfoot need attention before anything is laid over them.
Signs of damp, water damage or deterioration change what the floor needs, especially in bathrooms and laundries.
On a replacement, the old floor and its adhesive or underlay are removed first, and what we find then shapes the next step.
Illustrative photograph: filler used for surface repair
PREPARE AND LEVEL
Once the subfloor is understood, we repair, clean and level it so the new flooring has a stable, even base. Only then do we set out the layout and start laying.
Because surface preparation is so central to the result, it has its own page: surface preparation before tiling and flooring.
TWO KINDS OF FLOORING JOB
When flooring is part of a bigger job, the floor is sequenced with everything else in the room. In a bathroom, kitchen or laundry, any licensed plumbing or electrical work is coordinated with appropriately licensed tradespeople. If the new floor is tiled, it follows the same setting-out approach described on our wall and floor tiling page.
Replacement starts with careful removal and a clean-up of the old surface. This is often where the real condition of the subfloor shows itself. We explain what we’ve found and why we recommend a particular approach before the new floor goes down.
WORTH KNOWING BEFORE YOU ASK FOR A QUOTE
The scope of work, the materials and the method all depend on your property’s condition and what the assessment finds. Concealed damage under an old floor, or changes to the agreed scope, may affect the work and need further discussion. We’ll talk it through with you rather than push ahead. Read more in concealed damage and changes to scope. We don’t offer architectural or engineering services, and we don’t run a 24-hour emergency service.
The easiest first step is to send Ivan a text describing the floor, with a few clear photos or a short video (here’s what helps). Ivan reviews every enquiry personally and can arrange a free site inspection and quote. Call or text 0413 142 055, Monday to Sunday, 9am to 5pm, or use the enquiry form.